System integration

Define the upgrade around the existing system.

Assessment, HVAC retrofit and replacement, and air-conditioning modernization for existing equipment and systems.

Our role

What the division covers.

Mechanical equipment assessment

Review equipment condition, capacity and operation to inform retrofit or replacement decisions.

Retrofit & replacement

Review equipment duty and existing hydraulic, electrical and control interfaces before defining the works.

Modernization

Review efficiency and operating needs, with start-up and performance testing within the agreed project scope.

Scope & interfaces

Make the proposal clear.

Use the following points to define the package with our team. Installation execution, controls work, test witnessing and training should be identified expressly where required.

Package stagePoints to define in the project or service proposal
AssessmentEquipment and records to review; investigation and reporting requirements
InterfacesHydraulic, electrical, controls/BMS and physical connection responsibilities
ExecutionExtent of replacement/retrofit work, installation responsibility and shutdown arrangements
VerificationStart-up, testing, witnessing, acceptance and handover responsibilities

Start-up assistance and a complete commissioning process are distinct scopes. Confirm responsibilities, interfaces and acceptance criteria before appointment.

Your enquiry

Start with the right information.

  • Installed equipment data and available drawings
  • Known faults, constraints and operating records
  • Required duty and future operating needs
  • Site access, shutdown windows and proposed programme